In 2020, AGL Energy built and successfully commissioned the first thermal power plant in the region using biofuel (sunflower husk pellets) with an electric capacity of 7 MW. The TPP is based on modern power equipment: a steam condensing turbine generator TRIVENI TURBINE LTD and two steam boilers PROMISHLENA ENERGETIKA (together with KhKMZ).

The construction of the TPP was completed in a short time. From the beginning of construction work to commissioning – 10 months. TPP staff received unique experience in working with the equipment, because adjustment and commissioning of the main equipment was carried out remotely due to quarantine restrictions associated with Covid-19.

The main technological processes at the TPP are fully automated, the TPP meets all safety and environmental requirements. The TPP has a two-stage flue gas cleaning system, which ensures minimal emissions into the environment.

To participate in the development of the Ukrainian economy, during the construction of the TPP, it was decided to install auxiliary equipment (multicyclones, bag filters, cooling towers, pumps, fans, smoke exhausters, a fuel supply system, an ash removal system, etc.) of Ukrainian production.